The pre-construction checklist.

16 checks across zoning, budget, permits, site prep, builder vetting, and contract terms — everything to close out before a post gets set. Free, printable, no sign-up.

Almost every pole-barn horror story — the vanished deposit, the building the county made someone tear down, the pad that floods every spring — traces back to a check on this list that got skipped. Work through all 16 before you sign anything. Most take a phone call.

1. Land & zoning

Confirm the building is legal on your parcel before you spend a dollar on plans.

  • Zoning allows your building and its use

    Call the county planning office with your parcel number. Ask about the use class ("accessory building", "agricultural building") — an ag exemption can waive permit requirements entirely on farm parcels, but only if your use genuinely qualifies.

  • Setbacks and easements located on a survey

    Most counties require 10–50 ft from property lines and more from wells, septic fields, and road rights-of-way. Utility easements can cross a parcel invisibly — build on one and you may be forced to move the building at your cost.

  • HOA covenants and deed restrictions checked

    Deed restrictions survive even where zoning says yes. Check for size caps, exterior material rules ("no metal siding"), and outbuilding bans before ordering anything.

2. Budget

The shell quote is not the project cost. Set the all-in number first.

  • All-in budget set — not just the shell price

    Site work, concrete, electrical service, driveway access, and permits routinely add 30–60% on top of a bare shell quote. Price the whole project with the calculator before you compare builder bids.

  • 10–15% contingency reserved

    Rock during excavation, wet-site drainage fixes, and material price moves are normal, not exceptional. If the contingency goes unspent, it becomes your gravel apron or extra concrete.

3. Permits

Unpermitted buildings surface at insurance-claim time and at resale.

  • Building permit filed — or the exemption confirmed in writing

    If the county says you are exempt (common for agricultural use), get the name of who told you and an email confirming it. "The builder said we didn't need one" does not survive an insurance dispute.

  • Septic, well, and driveway permits where they apply

    A barndominium or any plumbed building usually triggers a septic review. New road access can need a driveway/culvert permit from the road authority — cheap now, expensive after the fact.

4. Site prep

Most "builder delays" are actually site problems the owner could have cleared in advance.

  • Truck access confirmed for delivery and concrete

    A semi with 60 ft trusses and a loaded concrete truck (~66,000 lbs) must reach the pad. Check gate widths, overhead lines, culvert ratings, and turning radius — a concrete pump truck day-rate is the usual price of getting this wrong.

  • Pad cleared, graded, and compacted

    The pad should sit above surrounding grade with topsoil stripped and fill compacted in lifts. Posts set in uncompacted fill settle — and everything above them moves with it.

  • Drainage planned away from the building

    Plan the water path before the building exists: swales, gutters, and downspout discharge that keep runoff off the slab and out of the post holes. Water is the #1 killer of post-frame buildings.

5. Builder vetting

Three quotes and three phone calls remove most of the risk in this project.

  • 3+ itemized bids compared line by line

    A lump-sum number hides what's excluded — and exclusions are where cheap bids live. Demand line items for posts, trusses, sheathing, doors, concrete, and site work so bids compare like-for-like.

  • License and insurance certificates verified directly

    Ask for the certificate of general liability AND workers' comp, then call the insurer to confirm it's current. If an uninsured crew member is hurt on your land, the claim can land on you.

  • References from 2+ completed builds called

    Ask each: Did the final price match the bid? What surprised you? Would you hire them again? Ask to see a building that's 3+ years old — new steel hides everything.

6. Contract & money

The contract terms below are where deposits go to die. Get them in writing.

  • Itemized contract with change-order terms

    The contract should name materials (gauge, brand, warranty), the payment schedule, the timeline, and how changes are priced and approved — in writing, before work, every time.

  • Deposit ≤25–30%, payments tied to milestones

    A deposit above ~30% before material delivery is a red flag. Tie each payment to something you can see: materials delivered, posts set, shell dried-in, final walkthrough.

  • Lien waivers collected at each payment

    If your builder doesn't pay the truss plant, the truss plant can lien YOUR property — even though you paid. A signed lien waiver with each check closes that door.

Print it: this page prints clean — take it to the county office and your builder meetings. Vetting builders? Start with the builder directory and request free quotes from several at once.

4 questions

Permits, deposits & plans, answered.

The pre-construction questions owners ask most.

Do I need a permit for a pole barn?

Usually yes. Most counties require a building permit for any structure over a size threshold (often 200 sq ft), with agricultural exemptions available on qualifying farm parcels. Rules are county-level, not state-level — call the local planning office with your parcel number, and if they say you are exempt, get it in writing.

How much deposit is normal for a pole barn?

Typically 10–30% at signing, often structured around the material order. Treat anything above 30% before materials are delivered as a red flag, and tie every later payment to a visible milestone — delivery, posts set, dried-in, completion.

How long does pole barn permitting take?

Anywhere from same-day (simple ag buildings in rural counties) to 6–8 weeks where engineered plans and site reviews are required. Submit before you schedule a builder — permit lag is the most common cause of a slipped start date.

Do I need engineered plans for a post-frame building?

Many counties accept standard post-frame plans for smaller buildings, but high snow loads, high wind zones, and living space (barndominiums) commonly trigger a stamped-engineer requirement. Your builder or truss supplier usually provides stamped drawings — confirm whose scope it's in before signing.

Stage 02 · Budget

Set the all-in number before the bids arrive.

Item one on the budget list: know what the whole project should cost — shell, concrete, utilities — so you can spot a bid that's hiding something.